The Single Day-Ahead Coupling (SDAC) Fallback Manual is now available and can be accessed on the NEMO Committee (https://www.nemo-committee.eu/assets/files/sdac-fallback-manual.pdf) and ENTSO-E websites (https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Network%20codes%20documents/NC%20CACM/SDAC%202025/SDAC_Fallback_Manual.pdf).
Jointly developed by the Nominated Electricity Market Operators (NEMOs) and Transmission System Operators (TSOs), the SDAC Fallback Manual offers comprehensive guidance on procedures to be followed in the event of a partial or full decoupling within the SDAC.
Effective from 30 September, the SDAC Fallback Manual is designed to support market participants in maintaining operational readiness and ensuring business continuity under exceptional circumstances.
Jointly developed by the Nominated Electricity Market Operators (NEMOs) and Transmission System Operators (TSOs), the SDAC Fallback Manual offers comprehensive guidance on procedures to be followed in the event of a partial or full decoupling within the SDAC.
Effective from 30 September, the SDAC Fallback Manual is designed to support market participants in maintaining operational readiness and ensuring business continuity under exceptional circumstances.
Nord Pool desk
| T: +47 6710 9110 (Day-ahead desk) | E: [email protected] |
| T: +47 6710 9115 (Intraday desk) | E: [email protected] |