Nord Pool Spot has received the following message from Svenska Kraftnät:
With reference to Exchange information no. 73/2006 and UMM Special Information 22.03.06 about System Protection the following clarification is given:
In situations with limitation in cut 4 the export capacity is allocated as the sum of
1. capacity allocated in proportion to the rated capacity on the interconnectors SwePol Link, Baltic Cable and Öresund
and
2. capacity contribution of installed system protection on DC-links allocated to respective link in proportion to the system protection’s impact on cut 4.
Lysaker, 9 February 2007
For further information, please contact Svenska Kraftnät:
Karl-Axel Karlsson, tel: +46 (0)8 739 78 65 or mobile +46 (0)70 539 78 65