The total Peak Load Capacity (PLC) production volume on the day-ahead market for the winter 2018-2019 is 1269 MW containing 562 MW in Sweden and 707 MW in Finland.
The Swedish PLC is available from 16 November 2018 – 15 March 2019 and the Finnish PLC is available from 1 of December 2018 – 28 February 2019.
The activation price of PLC production in the power exchange will be the level of price cap of the day-ahead market.
Activation of peak load capacity for power exchange in Finland and Sweden will be based on the activation rules published in Peak Load Capacity (“PLC”) in Sweden and Finland.
For further information, please contact:
Fingrid: Mikko Heikkilä, +358 40 6374720, mikko.heikkila@fingrid.fi
Svenska kraftnät: Linda Thell +46 10 475 8386, linda.thell@svk.se
Zarah Andersson +46 10 475 8015, zarah.andersson@svk.se